A repair problem becomes easier to manage when the issue, evidence, urgency and response are recorded clearly. That does not mean every disagreement has a simple owner-pays or tenant-pays answer. The cause, legal regime, contract date and work proposed can all matter.
This guide is researched to 27 October 2026. The national tenancy framework now includes October amendments relevant to repairs, including temporary housing. It helps you organise reporting and decisions without diagnosing a building, authorising a rent deduction or deciding liability for an individual problem.
Identify the arrangement before allocating responsibility
Start with the actual occupation and signed documents. Ordinary housing, temporary housing and tourist accommodation should not be treated as though every maintenance rule or procedure is identical.
The current Urban Leases Act distinguishes different repair questions, while the October amending decree introduces additional routes and temporary-housing provisions. Ask which rules apply to the actual facts and dates.
Avoid a blanket clause that one party pays for everything without review. A contract, a provider's opinion and a statutory responsibility are different parts of the enquiry, not interchangeable answers.
Describe the problem without guessing its cause
Record what happened, where, when it started and its practical effect. Include photographs where appropriate and safe. A clear description such as water appearing below a particular fitting is more useful than an unsupported diagnosis.
Note whether the problem is ongoing and what reasonable precautions have been taken. Preserve relevant messages, servicing information and the starting-condition record. Ask a competent professional to investigate where technical knowledge is required.
The inventory guide helps identify prior condition, while surveys and inspections explains why observations and a professional assessment have different roles.
Use the agreed reporting route promptly
Tell the responsible contact through the agreed channel and keep a record of the report. Identify the home and issue clearly, and ask who is handling the next step. A message to an unrelated viewing contact may not reach the person responsible for maintenance.
If a manager is involved, confirm whether they can instruct work or must obtain the owner's approval. Ask for a backup route when the normal contact is unavailable rather than waiting until an urgent problem occurs.
Do not assume an unanswered informal message starts every legal clock. Obtain advice about any formal communication, evidence and time limit required for the action you intend.
Separate an emergency from a routine appointment
Where there is an immediate safety concern, use the appropriate emergency or qualified service and follow its instructions. Do not attempt a repair you are not equipped to carry out merely to keep the tenancy discussion informal.
For urgent property damage, record the circumstances and communications, while taking appropriate advice about authority and necessary work. Emergency action, later reimbursement and responsibility for the underlying cause are separate issues.
A general guide cannot tell you whether a particular installation is safe or which isolation action is suitable. Ask the relevant professional and keep practical emergency information available for the actual home.
Understand that current statutory routes differ
The October provisions introduce written-request and response processes for certain repairs, with separate treatment of temporary housing. The conditions, evidence, timing and permitted action need checking before someone relies on them.
Do not jump from a general statement that repairs are needed to an assumption that any contractor invoice may be deducted from rent. Equally, an owner should not ignore a documented request on the assumption that every problem must wait for routine management.
Use independent advice on the actual notice, proposed budget and legal route. The tenancy-agreement guide and temporary-rental guide help identify the regime and records to bring to that discussion.
Distinguish maintenance, damage and improvement
Ask whether the work concerns preserving the agreed condition, damage attributable to someone, ordinary wear or an improvement the parties would like. These categories can have different implications and should not be collapsed into a contractor's total.
An appliance failing does not automatically establish who caused the problem or which replacement is appropriate. Age, condition, servicing and the actual diagnosis can be relevant. Obtain the evidence before treating an allegation as a debt.
If someone proposes a better specification or additional work, identify that separately. A necessary repair and a chosen upgrade should not become one unexplained charge without considering the agreement and legal position.
Arrange access with respect for the occupied home
Agree an appointment, who will attend, the purpose and any practical needs. Give clear contact information for changes. Necessary cooperation should be organised without treating ownership as unrestricted access to the tenant's home.
For privacy, the AEPD's rented-home camera guidance emphasises the occupant's private sphere. Do not use indoor monitoring as a substitute for an appropriate repair-reporting or access arrangement.
If access is disputed or a legal right needs enforcement, obtain advice rather than improvising entry. A management key and the right to use it are different matters.
Scope and authorise work clearly
Ask for a description of the problem, proposed work, materials, cost and exclusions. Where further investigation is needed, distinguish the diagnostic stage from a final repair quotation. Avoid approving an open-ended instruction without understanding the spending authority.
For substantial work, check relevant permissions, professional requirements and community responsibilities with appropriate advisers. The fact that a tenant reported the issue does not establish who may authorise an alteration to shared property.
Keep the quotation, approval and variations together. If a manager can spend up to an agreed limit, record how urgent exceptions are handled and how the owner and occupant receive updates.
Coordinate shared-building issues separately
A roof, facade, common pipe or another shared element may involve the community as well as landlord and tenant. Identify who will contact the administrator, investigate responsibility and follow up the work.
Read the community-of-owners guide. A common-element question should not disappear between several parties who each assume another person is handling it.
Ask who will deal with the immediate effect inside the home while the wider issue is assessed. Liability, insurance, access and technical repair can run on different tracks and need a clear contact for each.
Keep insurance separate from the basic response
Tell the relevant insurer or intermediary promptly where a claim may be involved and follow its process. Ask what evidence and approval are needed before work, while handling emergencies through the appropriate route.
The landlord-insurance guide explains questions about cover, exclusions and claims. A claim notification does not itself confirm coverage or decide every responsibility between the parties.
Keep photographs, reports, invoices and communications secure. Avoid sharing an occupant's personal details beyond what is needed for the work, claim or another legitimate purpose.
Close the job with evidence
Record completion, any remaining limitation and the appropriate test or confirmation from the provider. Ask the occupant whether the reported effect has been resolved, without treating that conversation as professional certification of hidden work.
Update the maintenance file and relevant equipment records. If costs remain disputed, keep the issue itemised rather than hiding it in the next rent payment or deposit account.
Use the rental worksheet and landlord-records guide to track the response. A good repair process leaves a clear account of the issue, action, evidence and unresolved questions for everyone involved.
Keep the next action visible
Before closing a conversation, identify the next step, who is responsible and how the parties will know it has happened. A clear action record helps distinguish waiting for access, waiting for a quotation and waiting for a legal response rather than allowing every delay to look the same.
Archive date: · Assigned archive dates explained
Prepared by Costa del Sol Property Guide · Sources researched · Updated
Prepared with AI assistance and source research. No independent legal, tax or surveying review. Read the standards · Report a possible correction



