COSTA DEL SOL PROPERTY — SYSTEMS AND EXTRA-ROOM EVIDENCE SHEET Prepared 11 November 2026. Use with a property-specific professional inspection. This is a record of questions, not a compliance certificate or system design. PROPERTY / ADDRESS: VIEWING DATE, TIME, WEATHER: YOUR INTENDED USE / OCCUPATION: Repeat the following block for each system, opening or extra room: 1. Room / equipment / precise location: 2. Exact advert wording and saved advert date: 3. Observed at the viewing: 4. Not observed / inaccessible / not demonstrated: 5. Seller or agent explanation (with date): 6. Documents requested and documents actually supplied: 7. Professional scope required / appointment arranged: 8. Ownership / rights / contract question: 9. Condition / operating / capacity question: 10. Proposed work and separate permissions enquiry: 11. Costs to obtain from quotations (do not invent an allowance): 12. Responsible person / next action / relevant deadline: 13. Outcome and evidence reference: 14. Still unresolved: SOLAR — generating electricity or heating water; equipment inventory; measured records versus forecasts; roof rights; ownership/finance; registration and supply arrangements; battery function; maintenance; warranties; monitoring handover. WINDOWS — room and opening; frame and glazing documents; shutter operation; light/shade observations; noise source and viewing time; repair history; professional testing scope; replacement permissions; full quotation exclusions. WATER — source and meter; documented supply rights; tanks/pumps/treatment; professional quality/capacity assessment; hot water; wastewater destination; rainwater/drainage history; shared responsibilities; routine handover explanation. EXTRA ROOMS — exact location; advertised versus proposed use; plans and records; conversion history; access; professional condition/ventilation/safe-use assessment; services; planning enquiries; rental assumptions; unresolved essential use. Keep documents securely; avoid circulating unnecessary personal account details. Do not enter tanks, dismantle equipment or conduct unsafe improvised tests.